Riverside Industrial Park
A single design-and-build appointment removed the usual gap between drawing set and site reality — one team carried the risk from concept to certificate.
Ground conditions near the river demanded a piled solution across three of the four plots, which we modelled and priced before contract signature.
Shared yard, drainage and power infrastructure were built first so each envelope could be released to its tenant independently.


The result
Handover was completed against the programme agreed at contract signature, with the commissioning record and as-built documentation issued in the same week rather than chased for months afterwards.
Next projectMelbourne Connect Has Brought.
